[eigenvector]... utilities will need far more advanced software and metering infrastructure
...and as I take it from other discussion, re-design, -engineering and replacement of some distribution station equipment and software to allow net power flow upstream when a substation's downstream DG exceeds downstream load, presently taken to be a fault condition.
A DG participation fee payable to the utility for infrastructure development and upgrades seems reasonable to me in light of these considerations.
Comments
...and as I take it from other discussion, re-design, -engineering and replacement of some distribution station equipment and software to allow net power flow upstream when a substation's downstream DG exceeds downstream load, presently taken to be a fault condition.
A DG participation fee payable to the utility for infrastructure development and upgrades seems reasonable to me in light of these considerations.