Skip to content

Comment on The Age of the Product Managerparent

Comments

Sure, but the process can become wildly unbalanced. If the engineering is enough of a limiting factor that 90% of the planned ideas never happen and the 10% remainder consists entirely of mission-critical features, then a PM doesn't have much value proposition and it makes sense to combine the engineer and PM roles (supplemented with a culture of "why are you doing that" at standups to prevent tunnel-vision).

The opposite can happen too, of course, when the engineers focus on features that nobody actually wants. I think grandparent's point was that PMs aren't always a good cure for this problem.

"If the engineering is enough of a limiting factor that 90% of the planned ideas never happen"

in other words...

If the team is wildly dysfunctional, then bad things are going to happen.

AboutSource Built by g1lg1l

Hackerly is an independent reader for Hacker News, built on the public HN API. Not affiliated with Y Combinator.