Those numbers seem wrong.

The Coalition plan likely involves VDSL2+, which is supposed to do 250 Mbps at the node, and 50 Mbps 1 km from the node, so likely 90%+ of the population would get 50-100 Mbps by 2016. 25 Mbps is the minimum, not the average.

And the NBN was supposed to do 1 Gbps within a few years. But the rollout might be slower.

Add to that that once FTTN is rolled out, it could be upgraded to FTTH/FTTP, for a lot less money, these numbers are really not as easy to compare.

Interesting point about the state of the existing exchanges, copper, etc..

The plan did make a brief comparison to other FTTN roll outs worldwide, e.g. AT&T uVerse. Wonder what problems they faced.