Skip to content

Comment on Nifty Freeway Interchange Designparent

Comments

Additional bridges not only increase the cost of the interchange, but also its size. To allow for a 5 m vertical clearance for the bridge, you will also need approach and exit ramps. If your maximum allowed design slope is 5%, you will need 100 m ramps at each side of the bridge, increasing the size of the interchange by 200 m.

AboutSource Built by g1lg1l

Hackerly is an independent reader for Hacker News, built on the public HN API. Not affiliated with Y Combinator.