Skip to content

Google purchases nuclear energy from Kairos Power SMRs

blog.google
1 pointespadrine2 comments
On HN

Comments

Five years to build each SMR is faster than what it takes to build a typical EPR (from 10 to 20 years), but it is still longer than what I expected. Besides, the 5-year figure might have overruns as they work through regulatory hoops towards a permit.

Nevertheless, before even having one built, it will allow Google to say that large model training will eventually not produce CO2.

AboutSource Built by g1lg1l

Hackerly is an independent reader for Hacker News, built on the public HN API. Not affiliated with Y Combinator.